當(dāng)前位置:首頁>新聞資訊>行業(yè)動(dòng)態(tài)固定式液壓登車橋安裝坑位要預(yù)留多大?

固定式液壓登車橋安裝坑位要預(yù)留多大?

文章出處:http://m.shyulang.cn/ 人氣: 0 發(fā)表時(shí)間:2023-01-11
在現(xiàn)在的倉儲(chǔ)設(shè)備中,固定式液壓登車橋一直發(fā)揮著很大的作用,給人們的裝卸貨提供了非常大的便利性,然后,它需要安裝在固定作業(yè)場(chǎng)合的貨臺(tái)上面,比移動(dòng)式液壓登車橋多了一個(gè)安裝的過程,那關(guān)于固定式液壓登車橋安裝坑位要預(yù)留多大?今天上海牛力機(jī)械就給大家介紹一下:
In the current storage equipment, the fixed hydraulic boarding bridge has always played a great role, providing great convenience for people to load and unload goods. Then, it needs to be installed on the cargo platform in the fixed working place, which is one more installation process than the mobile hydraulic boarding bridge. So how much should be reserved for the installation pit of the fixed hydraulic boarding bridge? Today, Shanghai Niuli Machinery will introduce to you:
固定式液壓登車橋安裝坑位要預(yù)留多大?
How large should the installation pit of fixed hydraulic boarding bridge be reserved?
由于固定式液壓登車橋有需要定做和不需要定做兩種形式,很多固定場(chǎng)合都是不需要定制的,上海牛力機(jī)械家常規(guī)款登車橋的尺寸是:2440*1830mm,需要預(yù)留的坑位是2600*1860*510mm,只要按照廠家這種標(biāo)準(zhǔn)型尺寸預(yù)留就可以了,然而,有的作業(yè)場(chǎng)合、環(huán)境不同,需要重新根據(jù)現(xiàn)場(chǎng)要求進(jìn)行定制才行,這個(gè)時(shí)候就需要廠家技術(shù)人員現(xiàn)場(chǎng)勘察,然后設(shè)計(jì)登車橋圖紙,才能確定預(yù)留的坑位大小。
Because there are two forms of fixed hydraulic boarding bridge that need to be customized and not need to be customized, many fixed occasions do not need to be customized. The size of the regular boarding bridge of Shanghai Niuli Machinery Co., Ltd. is 2440 * 1830 mm, and the pit to be reserved is 2600 * 1860 * 510mm. As long as it is reserved according to the standard size of the manufacturer, it can be done. However, some operating occasions and environments are different, and it needs to be customized according to the site requirements again, At this time, the manufacturer's technicians need to conduct on-site survey and then design the boarding bridge drawings to determine the size of the reserved pit.

固定式液壓登車橋
Fixed hydraulic boarding bridge
上海牛力機(jī)械固定式液壓登車橋
Shanghai Niuli Mechanical Fixed Hydraulic Boarding Bridge
固定式液壓登車橋簡(jiǎn)單的安裝過程!
Simple installation process of fixed hydraulic boarding bridge!
一、根據(jù)登車橋尺寸,先挖好一個(gè)地坑,無地坑是無法安裝的;
1、 According to the size of the boarding bridge, dig a pit first. No pit can be installed;
二、把地坑內(nèi)走線的線路預(yù)留好,在地坑尾部的中心地方;
2、 Reserve the wiring in the pit at the center of the pit tail;
三、地坑內(nèi)的三角邊都需要用鋼來包邊,把用于固定的錨釘焊接與角鋼的內(nèi)面,然后上面鋪一些沙子,再用混凝土鋪設(shè)一下;
3、 The triangular edges in the pit need to be wrapped with steel. The anchor nails used for fixing are welded to the inner surface of the angle steel, and then some sand is paved on it, and then concrete is paved;
四、將防撞膠塊固定于貨臺(tái)前端登車橋兩側(cè);
4、 Fix the anti-collision rubber block on both sides of the boarding bridge at the front of the cargo platform;
五、檢查下各個(gè)部位是否固定牢固,施工完畢。
5、 Check whether each part is fixed firmly and the construction is completed.
以上就是為大家介紹的有關(guān)移動(dòng)登車橋詳細(xì)的介紹,希望對(duì)您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://m.shyulang.cn
The above is the detailed introduction about the mobile boarding bridge for you, and I hope it can help you. If you have any questions, please contact us. We will provide you with our service with our attitude http://m.shyulang.cn
?